NPGRP.COM.AU
  • Home
  • About Us
  • PROJECTS
  • TESTIMONIALS
  • FUTURE TRADIES PROGRAM
  • COMMUNITY
  • CONTACT

Our Key Projects
We've completed over 850 projects across Northern Australia. Some of our favourite projects, past and present, are detailed below.

Joint Health Command, Larrakeyah & Robertson Barracks
Principal Contractor: Icon SI
Scope of Works: Ceilings, Partitions and Architectural Finishes
Completed: March 2023

The Joint Health Command (JHC) provides health care to ADF members and ensures the health preparedness of ADF personnel for operations, and, deployable elements of JHC Garrison and supported elements. 
​
NPG have been engaged by Icon to complete the ceilings, partitions, carpentry and architectural finishes to the external facade works to both sites. The Robertson Barracks Medical Center is a refurbishment of existing facilities with completion expected in March 2020. The new Medical Center at Larrakeyah commenced construction in October 2019.

R8000 NACC 3140 RAAF Base, Tindal
Principal Contractor: Lendlease Building
Scope of Works: Ceilings, Partitions and Carpentry
Completed: November 2022
The works at RAAF Base Tindal will provide a new secure precinct which will house the F-35A operations for both 75th Squadron and visiting Australian and International personnel at RAAF Base Tindal. The F-35A Operational Precinct including new Headquarters, Training and Aircraft Maintenance Facilities.
 
NPG has been engaged to build the internal walls and ceilings, in addition to the internal glazing and doors package across all new facilities. We have also been involved in the refurbishment of the existing facilities. 

​George Brown Visitor Centre
Principal Contractor: Sunbuild
Scope of Works: Ceilings, Partitions and Carpentry
Completed: September 2019
 
The NT Government funded a new Visitor Centre in the George Brown Botanical Gardens incorporating an internal air-conditioned space and an external deck area. The visitor centre also includes an interpretive display that houses a mixture of permanent and temporary exhibitions, which are centered on plants, places and people who have made our gardens unique. 
 
NPG was engaged to install the feature timber ceilings, decking, stair cases and flooring, in addition to the ceilings and partitions. 

STEAM Centre
Principal Contractor: Sunbuild
Scope of Works: Ceilings, Partitions and Carpentry
Completed: May 2019
  
The Darwin High School STEAM (Science, Technology, Engineering, Arts and Mathematics) Center has been built to provide students with a cutting-edge FAB-lab, fifteen contemporary interconnecting classrooms over two levels and presentation and project spaces.
 
NPG was engaged to construct the hellerup stairs, internal walls and feature ceilings, including 1350m2 of Supawood to the corridors connecting the classrooms. The hellerup stairs were designed and built out of spotted gum and were installed in a tongue and groove format.

Air Traffic Control Tower, Tindal
Principal Contractor: Lendlease Building
Scope of Works: Ceilings, Partitions and Carpentry
Completed: August 2018

This Department of Defence commissioned these works to construct a new sensor equipment building on the northern side of the base to house upgraded electrical equipment and the new air traffic control tower. The tower is a 25m high multi-level facility accommodating a control cabin, external observation deck and a crew rest area, toilet, kitchenette and mechanical plant room.
 
NPG was engaged to build the internal walls and ceilings. Working in with the builder, client, and other contractors (security, communications and electrical), NTPG coordinated the supply and installation of the doors and all security requirements.

Palmerston Regional Hospital
Principal Contractor: Lendlease Building
Scope of Works: Ceilings, Partitions, Carpentry, Doors and Internal Glazing
Completed: April 2018
 
​The Palmerston Regional Hospital was constructed to service the growing population in Palmerston and the rural areas of Darwin City. It consists of 116 beds, several operating theatres and state of the art administrative facilities. The project cost $170 million and was jointly funded by the Australian and Northern Territory Governments.
 
NPG was engaged to construct the internal walls and ceilings, including lead lining to the xray rooms and installation and structural design of the impressive two story arcade adjoining the wings of the building. The arcade features a custom designed baffle ceiling structure, designed to represent the rib cage of the building, acoustic ceiling system and feature ply panelling to the walls.

Event Cinemas, Palmerston
Principal Contractor: Buildcorp
Scope of Works: Specialist ceilings and partition walls
​Completed: September 2017

The cinema complex was constructed in the new Gateway Shopping Centre in Palmerston. The complex includes four general cinemas, two Vmax Theatres, Vmax Lounge, Candy Bar, foyer and public amenities.
 
NPG was engaged to build the internal walls and ceilings to the candy bar, foyer, lounge and public amenities. NTPG also fitted out the existing theatres services by cutting into an existing ceiling and patching penetrations, walls and floor construction and finishes. We also designed and lined the baffle walls to the Vmax auditoriums to allow for the curved screen installation and designed and constructed the seating platforms to all cinemas.
​
​Westpac: Darwin, Palmerston and Casuarina Square

Principal Contractor: FDC
Scope of Works: Specialist ceilings and partition walls
​Completed: August 2017

FDC was awarded the delivery of several Westpac retail branches across Australia inline with their national ‘Bank Now’ rebrand. Each branch was delivered under a design and construct model within a 4 to 5 week period whilst adhering to Westpac’s strict corporate guidelines. The refresh of each branch included the installation of new customer service areas, transaction rooms, facilities and kitchen for employees and ATM zones.
​
NPG was FDC's preferred subcontractor to complete the ceilings, partitions, specialised carpentry and door installation for the refurbishments undertaken in Darwin and Casuarina Square along with the new fitout at the Gateway Shopping Centre, Palmerston. ​​​

The Quarter Entertainment Precinct
Principal Contractor: Mainbrace
Scope of Works: Specialist ceilings and partition walls
​Completed: August 2016
 

​The Quarter was built to provide Darwin with a new entertainment and restaurant precinct within the premier shopping centre, Casuarina Square. Works included construction of 12 restaurants, refurbishment of the medical centre, construction of the new Timezone entertainment center, installation of a water feature and kids play area in addition to refurbishment of two feature entrances into the shopping center.
 
NPG was engaged to complete the ceilings and partitions work for the base build, including installation and structural design of the feature ceilings in the complex – Supawood and Alucobond. 
Site powered by Weebly. Managed by SiteGround
  • Home
  • About Us
  • PROJECTS
  • TESTIMONIALS
  • FUTURE TRADIES PROGRAM
  • COMMUNITY
  • CONTACT